Professional installation service by skilled technicians.
Service Fees for Air Delivery and Installation
This service covers new air conditioner installation with exposed piping, including refrigerant lines and electrical wiring.
Service fee includes:
Breaker, electrical wire, grounding wire
PVC drainage pipe
Rubber pads or compressor stand
Pipe cover with accessories, up to 4 meters
Exclusions:
Hanging brackets
Finishing work from ceiling, wall, or glass drilling (if any)
Additional installations can be paid on the appointment day according to the service details.
Service Appointment
Within 24 hours of successful payment, customer service will call you to schedule the installation.
Standard Equipment Provided (Free)
Breaker with cover 1 set (technician calculates the amperage based on the AC power consumption)
AC wire to compressor, 4 meters
Standard AC: 2 wires (L / N)
Inverter AC: 3 wires (L / N / C)
Rubber pad or compressor stand, 1 set (selected per site)
Ground wire, 4 meters
Pipe cover with accessories, 4 meters
PVC drain pipe, 4 meters
Adhesive fabric tape for refrigerant pipes, aluminum strip for securing pipes
Note: Maximum current is approximate; actual consumption varies by brand/model.
Scope / Conditions of Service
Provide photos of the installation area (indoor & outdoor units)
Service applies to new air conditioners only
Service covers 1 installation point; relocation incurs additional charges
Any additional equipment beyond standard provided will incur extra equipment and labor fees
Refrigerant and electrical wiring must be installed exposed along the wall
Customers must coordinate with building management or security for access
If ceiling wiring is impossible, wiring will be installed exposed along the wall to the control box
Installation will not occur in unsafe or structurally risky locations; technicians will advise alternative placements
Failed or inaccessible appointments incur 500 THB travel fee
Postponements must be notified 2 days prior, otherwise 500 THB travel fee
Standard equipment cannot be altered, replaced for cash, or exchanged
Ceiling or glass drilling: interior finishing must be done by customer’s interior team
Installation time: 2–4 hours depending on site complexity
Parking fees charged to customer if applicable
Service may be refused if site is unsafe for technicians
Photographs may be taken for service verification
Permission required to move customer property and cover items with protective sheets
Old AC removal incurs 500 THB fee
Heights over 3 meters requiring scaffolding: starting at 2,500 THB
Cancellation Policy:
Orders in transit cannot be canceled; delivery fees are non-refundable
Processing fee 500 THB will be deducted from service fees
Invoice: Sent via email used for purchase; issued 30 business days after service.
Warranty Terms
Warranty period: 180 days from service completion
Covers post-installation work; AC must not leak water
Repairs limited to damage caused by installation, verified by company personnel
Any modification, repair, or extension of AC post-installation voids warranty if not approved
Customer must report defects via chat within 7 days of discovery
Damage not caused by company is not covered
Company modifications do not extend warranty
Warranty Exclusions:
Natural disasters (storms, earthquakes, subsidence), accidents, fire, uncontrolled factors, pests, structural damage, or building vibrations
Misuse, abnormal operation, unauthorized modifications
Damage caused by third parties
Normal wear and tear or dirt accumulation
Lack of maintenance or non-compliance with company instructions
Service Area
Bangkok
Nonthaburi (except Sai Noi District)
Samut Prakan (except Bang Sao Thong & Bang Bo)
Pathum Thani (except Lat Lum Kaeo, Nong Suea, Sam Khok)
Nakhon Pathom (except Mueang, Nakhon Chai Si, Don Tum, Kamphaeng Saen, Sam Phran)
Samut Sakhon (except Krathum Baen & Ban Phaeo)
Additional Equipment Charges (Exceeding Standard)
| No | Item | Unit | Price (THB) |
|---|---|---|---|
| 1 | Safety breaker + box 2P 16–30A (Nano/Haco/National/Panasonic) | Set | 200 |
| 2 | Mini circuit breaker 32A | Piece | 300 |
| 3 | Refrigerant pipe 6/8” + insulation | Meter | 650 |
| 4 | Wire VAF 2x2.5 mm² | Meter | 30 |
| 5 | Wire VAF 2x4 mm² | Meter | 40 |
| 6 | Wire VAF 2x2.6 mm² | Meter | 70 |
| 7 | Wire THW 1x1.5 mm² | Meter | 20 |
| 8 | PVC wire duct or pipe | Meter | 70 |
| 9 | PVC drain pipe Class 3/8"-3/4" white | Meter | 70 |
| 10 | PVC pipe 3/8" white | Meter | 50 |
| 11 | Haco breaker 32A + box (3-phase) | Piece | 1,000 |
| 12 | Steel bracket for indoor/outdoor unit | Set | 500 |
| 13 | Steel basket bracket for outdoor unit | Set | 1,000 |
| 14 | Ground rod 30 cm (no wire) | Point | 500 |
| 15 | Condensate pump | Piece | 2,500 |
| 16 | Refrigerant pipe 3/8" & 1/2" white + insulation | Meter | 400 |
| 17 | Refrigerant pipe 5/8" white + insulation | Meter | 750 |
| 18 | Refrigerant pipe 7/8" white + insulation | Meter | 750 |
| 19 | Rubber stand 3” for outdoor unit (extra) | Set | 100 |
| 20 | Pipe cover #75 (with fittings per 1 meter) | Meter | 400 |
| 21 | Pipe cover #75 | Meter | 250 |
| 22 | Fitting (pipe cover) | Piece | 100 |
| 23 | Airflow deflector (outdoor unit) | Piece | 1,000 |
| 24 | Refrigerant R32 | psi | 50 |
| 25 | Refrigerant R410 | psi | 750 |
| 26 | Refrigerant R22 | psi | 30 |
| 27 | Old AC removal service | Set | 500 |
| 28 | Scaffolding ≤ 3m | Meter | 2,500 |
| 29 | Scaffolding 4m | Meter | 3,500 |
| 30 | Drilling / wall chasing / finishing (no paint) | Point | 300 |
Notes: For additional customer-supplied equipment, labor fee 50% of equipment cost plus company installation labor applies.